How to Reverse a Usage Decision of an Inspection Lot in QM

  • by Jawad Akhtar, Head of SAP Delivery, AbacusConsulting
  • June 26, 2013
You can change a usage decision of an inspection lot in the Quality Management module if you find an error such as incorrect data entry.

Sometimes an incorrect usage decision (UD) is in place for an inspection lot, due to either an incorrect manual data entry or an error made during collective or mass UDs to quality inspection lots. Because an incorrect UD code leads to incorrect calculation of quality scores, it is imperative that the user correct this anomaly as soon as possible. I’ll show you how to change the UD code of an inspection lot and how to provide the reason for the change in its long text.

Jawad Akhtar

Jawad Akhtar earned his chemical engineering degree from Missouri University of Science and Technology. He has 17 years of professional experience, of which nine years are in SAP. He has completed eight end-to-end SAP project implementation lifecycles in the areas of PP, QM, MM, PM, and DMS in the steel, automobile, chemical, fertilizer, FMCG, and building products industries. He also has worked as an SAP integration manager and an SAP project manager. He has been proactively involved in a business development and solution architect role for seven years. He is the author of Production Planning and Control with SAP ERP, it's filled with in-depth infomation on discrete, process, and repetitive manufacturing types. His profile on LinkedIn is at http://pk.linkedin.com/in/jawadakhtar. You may follow Jawad on Twitter @jawadahl. Currently, he is associated with AbacusConsulting as Head of SAP Delivery.

See more by this author


Comments

No comments have been submitted on this article. 


Please log in to post a comment.

To learn more about subscription access to premium content, click here.